|
||||||
| About us | News | Products | Services | Contact us | ||||||
|
Gasso Solution:
Gasso’s standard procedure is as follows : 2-1. Pro-Planning •Definition of requirements •Determining the premises and parameters •Clarifying production capacity and conditions •Determining the site conditions •Meeting and planning session at site 2-2. Layout •Basic and conceptual design including definition of building type, space necessities, production unit type, food program, operation method, equipment quality and energy consumption. •General layout drawing comprising room classification, process flow, material flows, staff flow and equipment flow •Final layout drawing along with equipment proposal, equipment specifications and budget forecast 2-3. Final Planning •Functional room concept •Final positioning of the equipment and workflow •Equipment list and specifications 2-4. Presentation •Presentation of the final planning and quotation to the client 2-5. Proposal finalization •Cooperation with the client for approval of the procedure •Revision and finalization of the proposal namely drawing, layout , equitment specification and budget forecast 2-6. Procurement •Evaluation and qualification of suppliers •Ordering and purchasing •Factory inspection 2-7. Installation •Installation drawing •Site control •Installation and erection •Commissioning 2-8. Training •Training the plant operators 2-9. Warranty •Spare part organization •Periodical services during the warranty life •After-sales service |
|||||
|
||||||